§ 62-139. Subdivision development.  


Latest version.
  • (a)

    The developer of any subdivision requiring a federal or state NPDES stormwater discharge permit shall obtain the required permit and develop and implement an overall SWPPP for the subdivision. Said SWPPP shall include BMPs to be used on individual lot building sites regardless of the issuance of a NOT.

    (b)

    City contractors installing public streets, water, sanitary sewer, storm sewer lines, and/or sidewalks shall comply with the developer's SWPPP and sign the appropriate contractor certification statement. For city-contracted work in public right-of-way or easements requiring a federal or state NPDES stormwater discharge permit, the city shall obtain the required permit and prepare the SWPPP, while the city contractor shall implement the required SWPPP.

    (c)

    Any utility company installing utilities within a new subdivision shall comply with the developer's SWPPP and sign the appropriate contractor certification statement. For work in public rights-of-way or easements requiring a federal or state NPDES stormwater discharge permit, the utility company shall obtain the required permit and preparing and implementing the required SWPPP.

    (d)

    The purchasers of individual lots within the subdivision shall comply with the developer's SWPPP by following the BMPs for individual lot building sites, and shall sign a certification statement agreeing to do so.

(Prior Code(2), § 14.07.100; Ord. No. 4182, § 1, 2008)